Colocation, Turnkey Data Center
Orangeburg NY | ORNY1
Occupying 23 acres of land in Orangeburg, New York, our data center spans 232,000 square feet and provides customizable infrastructure solutions. It’s strategically located less than a mile from the New Jersey border and 22 miles from Midtown Manhattan, ensuring low-latency connectivity to major interconnection hubs in the region. Coupled with additional benefits including low power costs and sales tax abatement, our Orangeburg facility is the ultimate data center destination where performance and scalability meet substantial cost savings.
232000
Sq Ft Space
Sq Ft Space
24000
KW Power
KW Power
12
Providers
Providers
Location Features
The data center is in an optimal location for latency-sensitive applications, business continuity, and disaster recovery facilities. The state-of-the-art building is designed to meet the highest standards of infrastructure requirements to service the New York and New Jersey markets. Ample access to power satisfies and exceeds critical networks’ needs for connectivity. With 2N and N+1 power available, our Orangeburg, NY data center is ready to meet the most stringent requirements.
Power
- 24 MW provisioned in an N+2 scheme
- 12 MW on-site
- High density 10KW + per cabinets
- Lowest cost power in region
- Two 13.2 kv utility circuits fed by separate substations
- Separate power substations from NY & NJ Critical IT load: 1.9 MW
Network
- Multiple lit and dark providers
- 1 gig-10 gig services to buildings across New York and New Jersey
- Access to connectivity hubs in Manhattan at 60 Hudson and 111 8th Avenue
- Access to New York, New Jersey, and Connecticut data centers
Security
- Fenced facilities with intrusion alarms
- Mantraps
- CCTV security cameras
- Biometric, keycard, and pin code access
- Pre-action fire detection and suppression systems
- 15-minute emergency support response time
Space & Expansion
- 60′ tall extension of 230,000 sq. ft
- Planned second building for a total of 462,000 sq. ft
- On-site substation with 50 MW capacity